{"id":11563,"date":"2017-12-13T12:02:01","date_gmt":"2017-12-13T12:02:01","guid":{"rendered":"https:\/\/countydonegalfrs.ie\/?page_id=11563"},"modified":"2020-02-19T08:53:19","modified_gmt":"2020-02-19T08:53:19","slug":"the-project","status":"publish","type":"page","link":"https:\/\/countydonegalfrs.ie\/index.php\/the-project\/","title":{"rendered":"The Project"},"content":{"rendered":"<div class=\"limit-wrapper\"><div class=\"row \"><div class=\"wpv-grid grid-1-1  wpv-first-level first unextended no-extended-padding\" style=\"padding-top:0.05px;padding-bottom:0.05px;\" id=\"wpv-column-e0c2adc85641003175b8e7b69e7a57f5\" ><p><a href=\"https:\/\/countydonegalfrs.ie\/wp-content\/uploads\/2019\/11\/Lifford_0001_DJI_0182.jpg\"><img loading=\"lazy\" class=\"alignnone wp-image-11886 size-full\" src=\"https:\/\/countydonegalfrs.ie\/wp-content\/uploads\/2019\/11\/Lifford_0001_DJI_0182.jpg\" alt=\"\" width=\"2048\" height=\"699\" \/><\/a><\/div><\/div><\/div>\n<div class=\"limit-wrapper\"><div class=\"row \"><div class=\"wpv-grid grid-1-1  wpv-first-level first unextended no-extended-padding\" style=\"padding-top:0.05px;padding-bottom:0.05px;\" id=\"wpv-column-e5db7a3acd03b06fa14c5ef22b59b0d7\" ><h6>Overview<\/h6>\n<p>The Office of Public Works (OPW) in partnership with Donegal County Council, have commissioned the Lifford Flood Relief Scheme to address flooding in the town.<\/p>\n<h6>Objectives and Project Need<\/h6>\n<p>The objective of this project is to implement a flood relief scheme for Lifford town that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding to the community of Lifford, to a determined \u201cStandard of Protection\u201d, and to procure, manage and oversee the construction of that scheme.<\/p>\n<h6>How the work is being delivered<\/h6>\n<p>Taking into account, but not relying on, the work done and outcomes of the North Western &#8211; Neagh Bann CFRAM Study regarding measures proposed in the FRMP for Lifford, RPS are working in collaboration with Ryan Hanley in assessing and undertaking the design of potential options, for achieving a scheme to provide flood relief from fluvial flooding in Lifford.\u00a0<b><span class=\"Apple-converted-space\">\u00a0<\/span><\/b><\/p>\n<h6>Proposed Solution<\/h6>\n<p>The flood relief scheme will compromise five stages, as follows:<\/p>\n<h5>Stage I:\u00a0Scheme Development and Design<\/h5>\n<p>Stage 1 will involve the collection of all relevant data related the project, a survey specification will be prepared, tendered and managed and a hydrological and hydraulic analysis of the study area will be carried out. A full cost-benefit analysis of the project will also be undertaken during this stage.<\/p>\n<h5>Stage II:\u00a0Public Exhibition under the 1945 &amp; 1995 Arterial Drainage Acts<\/h5>\n<p>Public Exhibition<\/p>\n<h5>Stage III:\u00a0Detailed Construction Design, Confirmation and Tender<\/h5>\n<p>Detailed Design &amp; Scheme Confirmation by Minister for Public Expenditure and Reform.<br \/>It is proposed that the Flood Relief Scheme may be constructed directly by the Office of Public Works once confirmation has been attained and all detailed design has been finalised.<\/p>\n<h5><strong>Stage IV \u2013 Construction<\/strong><\/h5>\n<p>Construction will potentially be carried out by OPW direct Labour, supervised by the consultant. A Functioning Scheme will be in place at the end of stage IV.<\/p>\n<h5><strong>Stage V \u2013 Handover of Works<span class=\"Apple-converted-space\">\u00a0<\/span><\/strong><\/h5>\n<p>Commission of the completion certificate. Preparation of a financial analysis report for the project .\u00a0 \u2018As-Built\u2019 surveys, \u2018As-Built\u2019 flood mapping and an updated Climate Change Adaption plan will be prepared.<\/p>\n<hr \/><\/div><\/div><\/div>\n<div class=\"limit-wrapper\"><div class=\"row \"><div class=\"wpv-grid grid-1-1  wpv-first-level first unextended no-extended-padding\" style=\"padding-top:0.05px;padding-bottom:0.05px;\" id=\"wpv-column-16adef4401fcd4c2c409bcd76ffc80d2\" ><figure class=\"wp-block-image size-large\"><img class=\"wp-image-11954\" src=\"https:\/\/countydonegalfrs.ie\/wp-content\/uploads\/2020\/02\/Revised-Programme-.jpg\" alt=\"\" \/><\/figure>\n<p><span style=\"color: inherit; font-size: 1em; font-weight: 600;\">Public Participation<\/span><\/p>\n<hr \/>\n<p>The Project will include opportunities to participate in public consultation, as well as project information and updates on progress including through this website and events.<\/p>\n<p>The public are encouraged to particpate in Public Consultation events which will be held at various stages throughout the project. These events are in addition to the Public Exhibtion of the Scheme.<\/p>\n<p>A first, opening Public consultation event shall be held on the 27th of February 2020 in the Old Courthouse, Lifford. A second, closing PCD will be held once a preferred scheme has been identified and agreed with the steering group.<\/p>\n<p>The project team can be contacted with queries \/ submissions by both\u00a0email and post.<\/div><\/div><\/div>\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Overview The Office of Public Works (OPW) in partnership with Donegal County Council, have commissioned the Lifford Flood Relief Scheme to address flooding in the town. Objectives and Project Need The objective of this project is to implement a flood relief scheme for Lifford town that is technically, socially, environmentally and economically acceptable, to alleviate&#8230;<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/countydonegalfrs.ie\/index.php\/wp-json\/wp\/v2\/pages\/11563"}],"collection":[{"href":"https:\/\/countydonegalfrs.ie\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/countydonegalfrs.ie\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/countydonegalfrs.ie\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/countydonegalfrs.ie\/index.php\/wp-json\/wp\/v2\/comments?post=11563"}],"version-history":[{"count":71,"href":"https:\/\/countydonegalfrs.ie\/index.php\/wp-json\/wp\/v2\/pages\/11563\/revisions"}],"predecessor-version":[{"id":12030,"href":"https:\/\/countydonegalfrs.ie\/index.php\/wp-json\/wp\/v2\/pages\/11563\/revisions\/12030"}],"wp:attachment":[{"href":"https:\/\/countydonegalfrs.ie\/index.php\/wp-json\/wp\/v2\/media?parent=11563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}